Technology
![Picture](/uploads/1/3/0/6/13066963/8842486.png?741)
Gantt Chart
Planning of the Project
Planning of the Project
Reflection - Week 1 (4-8 November)
This week in Technology I am supposed to finish the outline and finish tie-dye at the weekend. In my opinion I have did well in outlining. I think the picture fits well in the shirt as the design is supposed to be. I did finish fast in outlining. I was supposed to tie-dye after outlining, but because I still have a period left and I am supposed to tie-dye at home, I started to batik the shirt. I followed my plan in the first part, but I didn’t follow the order. I have to wax it first because I can’t tie-dye in that situation. Unfortunately I didn’t have time to tie-dye the shirt because I am unavailable on Saturday and I woke up late at Sunday and still have to do other things. Next weekend I have to finish the Batik and Tie-dye so the next Technology lesson I can boil and color.
This week in Technology I am supposed to finish the outline and finish tie-dye at the weekend. In my opinion I have did well in outlining. I think the picture fits well in the shirt as the design is supposed to be. I did finish fast in outlining. I was supposed to tie-dye after outlining, but because I still have a period left and I am supposed to tie-dye at home, I started to batik the shirt. I followed my plan in the first part, but I didn’t follow the order. I have to wax it first because I can’t tie-dye in that situation. Unfortunately I didn’t have time to tie-dye the shirt because I am unavailable on Saturday and I woke up late at Sunday and still have to do other things. Next weekend I have to finish the Batik and Tie-dye so the next Technology lesson I can boil and color.
![Picture](/uploads/1/3/0/6/13066963/2806384.png?503)
Revised Gantt chart
Due to the Flag Ceremony, we have to postpone the schedule and revise it.
Due to the Flag Ceremony, we have to postpone the schedule and revise it.
Reflection Week 2 (11-15 November)
This week I am supposed to tie-dye and batik from the revised Gantt chart. Monday was cut because we have flag ceremony, so this week we only have a period to do the project plus another 2 periods on a new week. This Wednesday, I was supposed to batik after finishing the tie-dye, but because the tie-dye can’t dry at the morning I have to continue the reflection at school. I believe that the next period I can finish the batik waxing because I already have wax most of the outlines. In the weekend I have finished tie-dye and at Monday I have to finish the batik. Apparently I have bought the wrong product so I have to ask who has finished the tie-dye and then I tie-dye it THIS WEEKEND, finished when I bring it on Monday. I have not done well in following my plan ad it’s ruined because of buying the wrong product. I have not done well and next time I have to ask clearly what a product we have to buy ourselves looks like. I have done well though in rethinking my plan and I got another idea of the plan. Next time I have to follow my plan and make sure everything is in track and it’
This week I am supposed to tie-dye and batik from the revised Gantt chart. Monday was cut because we have flag ceremony, so this week we only have a period to do the project plus another 2 periods on a new week. This Wednesday, I was supposed to batik after finishing the tie-dye, but because the tie-dye can’t dry at the morning I have to continue the reflection at school. I believe that the next period I can finish the batik waxing because I already have wax most of the outlines. In the weekend I have finished tie-dye and at Monday I have to finish the batik. Apparently I have bought the wrong product so I have to ask who has finished the tie-dye and then I tie-dye it THIS WEEKEND, finished when I bring it on Monday. I have not done well in following my plan ad it’s ruined because of buying the wrong product. I have not done well and next time I have to ask clearly what a product we have to buy ourselves looks like. I have done well though in rethinking my plan and I got another idea of the plan. Next time I have to follow my plan and make sure everything is in track and it’
![Picture](/uploads/1/3/0/6/13066963/6090135.png?675)
Revised Gantt Chart:
Green for following the plan
Red for not following the plan
Yellow for plan.
I have changed the plan from the last one because I bought the wrong product for tie-dyeing.
Green for following the plan
Red for not following the plan
Yellow for plan.
I have changed the plan from the last one because I bought the wrong product for tie-dyeing.
Reflection Week 3 – 18-22 November 2013
This week I got to paint and batik. I finished Batik in time, and because I was bored I continued painting at lunchtime. I didn’t finish all the painting, but I will continue next week. I am sure I will finish in time. I continued the plan perfectly and if I am about to do the same thing as this week I will finish it on time, I am so sure. What I want to do is to follow the plan again like this week.
This week I got to paint and batik. I finished Batik in time, and because I was bored I continued painting at lunchtime. I didn’t finish all the painting, but I will continue next week. I am sure I will finish in time. I continued the plan perfectly and if I am about to do the same thing as this week I will finish it on time, I am so sure. What I want to do is to follow the plan again like this week.
![Picture](/uploads/1/3/0/6/13066963/9581998.png?671)
Gantt Chart
it's not revised but it shows what I did to the plan.
it's not revised but it shows what I did to the plan.
Reflection Week 4 – 25 November 2013
This week I am supposed to continue the painting and the boil the shirt to peel off the wax. There are only 2 periods this week, which is supposed to be replacing the 2 periods we skipped because of the flag ceremony. I continued the plan nicely until an accident happen. When I am about to add red paint, the black paint bottle, which is nearly empty, is blown by the quite strong wind and it fell to my shirt. The black paint splashed on my shirt, making it look terrible. After I continued and finished all the painting, I was helped to make it look nicer. We spent some time on this, and we didn’t have time to wait for it until it dries. So I ask so they will boil it for me. Now, it’s finished. Next time, I have to be more careful.
This week I am supposed to continue the painting and the boil the shirt to peel off the wax. There are only 2 periods this week, which is supposed to be replacing the 2 periods we skipped because of the flag ceremony. I continued the plan nicely until an accident happen. When I am about to add red paint, the black paint bottle, which is nearly empty, is blown by the quite strong wind and it fell to my shirt. The black paint splashed on my shirt, making it look terrible. After I continued and finished all the painting, I was helped to make it look nicer. We spent some time on this, and we didn’t have time to wait for it until it dries. So I ask so they will boil it for me. Now, it’s finished. Next time, I have to be more careful.
![Picture](/uploads/1/3/0/6/13066963/1815208.png?660)
Gantt Chart
Shows what I did in making the project.
Shows what I did in making the project.
REFLECTION
I compared it to the design. I had three accidents in making the shirt, or exactly when painting the shirt. The first one was a misunderstanding. When I was talking to Ibu Lisa about how much I used green, she told me to just pour the green paint on the shirt. She did it, but out of misunderstanding she poured it to a part that was supposed to be blue. The second one was when I spilled green paint to the mountains drawing, and it made a splash mark. The third one is when the wind blows the black paint to my shirt. Out of these accidents, of course the worst one is the last one. But all these accidents brought my t-shirt away from the design. It’s not like the design. It’s as if the shirt is another design with splashing paint as the design. I think other things accept the accidents are okay and it looks like the design. Next time, I have to be more careful and I have to pick a place that doesn’t take risks of any accidents.
I compared it to the design. I had three accidents in making the shirt, or exactly when painting the shirt. The first one was a misunderstanding. When I was talking to Ibu Lisa about how much I used green, she told me to just pour the green paint on the shirt. She did it, but out of misunderstanding she poured it to a part that was supposed to be blue. The second one was when I spilled green paint to the mountains drawing, and it made a splash mark. The third one is when the wind blows the black paint to my shirt. Out of these accidents, of course the worst one is the last one. But all these accidents brought my t-shirt away from the design. It’s not like the design. It’s as if the shirt is another design with splashing paint as the design. I think other things accept the accidents are okay and it looks like the design. Next time, I have to be more careful and I have to pick a place that doesn’t take risks of any accidents.